Montrose has always played an important role in the energy supply chain, and as the industry has changed, the port has also adapted. We are now known as a major operations and maintenance hub for the North Sea renewable energy sector due to our prime location on the North East Coast and accessible transport links both north and south.
As the largest chain and anchor port globally and with our award-winning safety standards, Montrose provides 24/7 marine operations, 365 days a year, ideal for service and operations vessels for developing offshore renewable projects in wind, solar and tidal.
Address: Harbour Office, South Quay, Montrose, DD10 9SL
Email: info@montroseport.co.uk
Website: www.montroseport.co.uk
- Experienced offshore wind operations and maintenance hub
- 1km Quayside Available
- Largest chain and anchor port globally
Existing Quayside & Water Depths
- Quay Length at <8m CD Water Depth: 625m
- Quay Length at 8m-10m CD Water Depth: 375m
- Quay Length at 10m-12m CD Water Depth: 0
- Quay Length at 12m+ CD Water Depth: 0
- Total Quay Length: 1,000m
Existing Site Infrastructure
- Max Load Bearing - Quayside: 15 t/m² UDL
- Max Load Bearing - Storage Area: 8 t/m² UDL
- Yard Space at Quayside: 13 Hectares
- Covered Storage: 4 m²
- Wet Storage: 0
Future Infrastructure Plans
- Quayside Length: 1,462m
- Water Depth - Minimum: 6.0m
- Water Depth - Maximum: 9.0m
- Load Bearing - Quayside: 15 t/m²
- Load Bearing - Storage Area: 8 t/m²
- Yard Space at Quayside: 18.2 Hectares
- Wet Storage: 0
- Year of Implementation: 2025
- Year Available: 2030
Existing Infrastructure for XL Components
- Heavy Lift Quay Length: 375m
- Heavy Lift Quay Area: 9,375m²
- Heavy Lift Load Bearing - Quayside: 15 t/m² UDL
- Large Component Laydown Area: 0
- Laydown Area Load Bearing Capacity: 0
Future Infrastructure for XL Components
- Heavy Lift Quay Length: 375m
- Heavy Lift Quay Area: 9,375m²
- Heavy Lift Load Bearing - Quayside: 15 t/m² UDL
- Large Component Laydown Area: 0
- Laydown Area Load Bearing Capacity: 0