Fraserburgh Harbour is uniquely positioned through experience, location and capability to support offshore wind development. All essential services, including transport, fuel, sonar, engineering and navigation are available from an extensive, on-site local supply chain and we are home to the Moray East Offshore Windfarm Operations & Maintenance Base.
Address: Shore Street, Fraserburgh, AB43 9BR
Email: info@fraserburgh-harbour.co.uk
Website: www.fraserburgh-harbour.co.uk
- Active Offshore Wind Operations & Maintenance Base
- Major Infrastructure Development Plans
Existing Quayside & Infrastructure
- Quay Length at <8m CD Water Depth: 170m
- Total Quay Length: 170m
- Max Load Bearing - Quayside: 2 t/m² UDL
- Max Load Bearing - Storage Area: 2 t/m² UDL
- Yard Space at Quayside: 0
- Covered Storage: 0
- Wet Storage: 0
Future Infrastructure Plans
- Quayside Length: 742m
- Water Depth - Minimum: 10.0m
- Water Depth - Maximum: 10.0m
- Load Bearing - Quayside: 20 t/m²
- Load Bearing - Storage Area: 10 t/m²
- Yard Space at Quayside: TBD
- Wet Storage: 0
- Year of Implementation: 2028
- Year Available: 2032