With a 20-year track record successfully delivering renewables projects, Port of Cromarty Firth has naturally sheltered deep waters providing 24/7/365 access for optimised transportation and installation. >1km quay, min. 12m depth, adjacent to laydown areas totalling >12 Ha providing unrestricted open storage and heavy load-bearing capacity for the largest components.
Address: Port Office, Shore Road, Invergordon IV18 0HD
Email: port@pocf.co.uk
Website: www.pocf.co.uk
- Green Freeport
- Over 1.2km Combined Quayside
- 22 Hectares open storage area
- Naturally Sheltered Deep Water Harbour
- Up to 70 wet storage locations
Existing Quayside & Water Depths
- Quay Length at <8m CD Water Depth: 145m
- Quay Length at 8m-10m CD Water Depth: 130m
- Quay Length at 10m-12m CD Water Depth: 300m
- Quay Length at 12m+ CD Water Depth: 680m
- Total Quay Length: 1,255m
Existing Site Infrastructure
- Max Load Bearing - Quayside: 25 t/m² UDL
- Max Load Bearing - Storage Area: 25 t/m² UDL
- Yard Space at Quayside: 22 Hectares
- Covered Storage: 1,500 m²
- Wet Storage: 70
Future Infrastructure Plans
- Quayside Length: 1,413m
- Water Depth - Minimum: 12.0m
- Water Depth - Maximum: 16.0m
- Load Bearing - Quayside: 25 t/m²
- Load Bearing - Storage Area: 25 t/m²
- Yard Space at Quayside: 33.8 Hectares
- Wet Storage: 70
- Year of Implementation: 2025
- Year Available: 2027
Existing Infrastructure for XL Components
- Heavy Lift Quay Length: 372m
- Heavy Lift Quay Area: 92,000m²
- Heavy Lift Load Bearing - Quayside: 25 t/m² UDL
- Large Component Laydown Area: 12 Hectares
- Laydown Area Load Bearing Capacity: 25 t/m² UDL
Future Infrastructure for XL Components
- Heavy Lift Quay Length: 600m+
- Heavy Lift Quay Area: 97,000m²
- Heavy Lift Load Bearing - Quayside: 25 t/m² UDL
- Large Component Laydown Area: 17+ Hectares
- Laydown Area Load Bearing Capacity: 25 t/m² UDL