Stornoway Port is the main port of the Outer Hebrides; it supports a wide range of sectors including leisure, lifeline ferry services and a range of commercial sectors. The new Deep Water Terminal offers two additional berths suitable for the offshore wind sector.
Address: Amity House, Esplanade Quay, Stornoway, Isle of Lewis, HS1 2XS
Email: info@stornowayport.com
Website: www.stornowayport.com
- New Deep Water Terminal, offering two suitable berths for the offshore wind sector.
- Over 1,400m Quayside
- 10 Hectares of yard space available
Existing Quayside & Water Depths
- Quay Length at <8m CD Water Depth: 1,085m
- Quay Length at 8m-10m CD Water Depth: 145m
- Quay Length at 10m-12m CD Water Depth: 201m
- Quay Length at 12m+ CD Water Depth: 0
- Total Quay Length: 1,431m
Existing Site Infrastructure
- Max Load Bearing - Quayside: 10 t/m² UDL
- Max Load Bearing - Storage Area: 15 t/m² UDL
- Yard Space at Quayside: 10 Hectares
- Covered Storage: 0
- Wet Storage: 1
Future Infrastructure Plans
- Quayside Length: 1,541m
- Water Depth - Minimum: 13.0m
- Water Depth - Maximum: 18.0m
- Load Bearing - Quayside: 25 t/m²
- Load Bearing - Storage Area: 25 t/m²
- Yard Space at Quayside: 14 Hectares
- Wet Storage: 1
- Year of Implementation: 2026
- Year Available: 2026
Existing Infrastructure for XL Components
- Heavy Lift Quay Length: 446m
- Heavy Lift Quay Area: 8,920m²
- Heavy Lift Load Bearing - Quayside: 10 t/m² UDL
- Large Component Laydown Area: 6 Hectares
- Laydown Area Load Bearing Capacity: 15 t/m² UDL
Future Infrastructure for XL Components
- Heavy Lift Quay Length: 556m
- Heavy Lift Quay Area: 11,120m²
- Heavy Lift Load Bearing - Quayside: 25 t/m² UDL
- Large Component Laydown Area: 10 Hectares
- Laydown Area Load Bearing Capacity: 15 t/m² UDL