Peterhead Port Authority operates the UK's most unique all-purpose, all-weather port 24/7/365.
With more than 3km of berthing space at depths of up to 14m, we have a proud record of directly providing and supporting the provision of first-class facilities and services for the fisheries, oil and gas, renewables and leisure sectors.
Address: Harbour Office, West Pier, Peterhead, AB42 1DW
Email: keith.mackie@peterheadport.co.uk
Website: www.peterheadport.co.uk
- 3km Berthing Space
- 14m Water Depth
- Operational 24/7/365
Existing Quayside & Water Depths
- Quay Length at <8m CD Water Depth: 2,000m
- Quay Length at 8m-10m CD Water Depth: 700m
- Quay Length at 10m-12m CD Water Depth: 200m
- Quay Length at 12m+ CD Water Depth: 250m
- Total Quay Length: 3,150m
Existing Site Infrastructure
- Max Load Bearing - Quayside: 15 t/m² UDL
- Max Load Bearing - Storage Area: 28 t/m² UDL
- Yard Space at Quayside: 6 Hectares
- Covered Storage: 16,500 m²
- Wet Storage: 0
Future Infrastructure Plans
- Quayside Length: 3,230m
- Water Depth - Minimum: 3.5m
- Water Depth - Maximum: 16.0m
- Load Bearing - Quayside: 25 t/m²
- Load Bearing - Storage Area: 28 t/m²
- Yard Space at Quayside: 10 Hectares
- Wet Storage: 2
- Year of Implementation: 2027
- Year Available: 2028
Existing Infrastructure for XL Components
- Heavy Lift Quay Length: 1,100m
- Heavy Lift Quay Area: 16,550m²
- Heavy Lift Load Bearing - Quayside: 25 t/m² UDL
- Large Component Laydown Area: 6 Hectares
- Laydown Area Load Bearing Capacity: 28 t/m² UDL
Future Infrastructure for XL Components
- Heavy Lift Quay Length: 1,580m
- Heavy Lift Quay Area: 18,000m²
- Heavy Lift Load Bearing - Quayside: 25 t/m² UDL
- Large Component Laydown Area: 10 Hectares
- Laydown Area Load Bearing Capacity: 28 t/m² UDL