

Haventus is the owner of Ardersier Energy Transition Facility, offering deployment solutions across the entire value chain. With access via sea and road to more than 450 acres, an initial >650 metres of quay and a naturally sheltered harbour, Ardersier ETF offers a prime location for optimised and efficient operations.

Address: Ardersier Port Approach, Inverness, IV2 7QX
Email: enquiries@haventus.com
Website: www.haventus.com
- Green Freeport
- 1,400,000m2 Port Facility
- 650m+ Deep Water Quayside
- Naturally Sheltered Harbour
- Statutory Harbour Authority

Existing Quayside & Water Depths
- Quay Length at <8m CD Water Depth: 0
- Quay Length at 8m-10m CD Water Depth: 0
- Quay Length at 10m-12m CD Water Depth: 0
- Quay Length at 12m+ CD Water Depth: 659m
- Total Quay Length: 659m

Existing Site Infrastructure
- Max Load Bearing - Quayside: 25 t/m² UDL
- Max Load Bearing - Storage Area: 25 t/m² UDL
- Available Space at Quayside: 1,400,000m2

Future Infrastructure Plans
- Quayside Length: 1,500m
- Water Depth - Minimum: 3.0m
- Water Depth - Maximum: 12.4m
- Load Bearing - Quayside: 25 t/m²
- Load Bearing - Storage Area: 25 t/m²
- Yard Space at Quayside: 2,200,000m2
- Dry Storage
- Year of Implementation: 2025
- Year Available: 2028

Existing Infrastructure for XL Components
- Heavy Lift Quay Length: 659m
- Heavy Lift Quay Area: 49,779m²
- Heavy Lift Load Bearing - Quayside: 25 t/m² UDL
- Large Component Laydown Area: 150 Hectares
- Laydown Area Load Bearing Capacity: 25 t/m² UDL
Future Infrastructure for XL Components
- Heavy Lift Quay Length: 1,500m
- Heavy Lift Quay Area: 240,419m²
- Heavy Lift Load Bearing - Quayside: 25 t/m² UDL
- Large Component Laydown Area: 150 Hectares
- Laydown Area Load Bearing Capacity: 25 t/m² UDL