Ardersier Energy Transition Facility

Ardersier Energy Transition Facility

Haventus is the owner of Ardersier Energy Transition Facility, offering deployment solutions across the entire value chain. With access via sea and road to more than 450 acres, an initial >650 metres of quay and a naturally sheltered harbour, Ardersier ETF offers a prime location for optimised and efficient operations.

Latest Port Image 1

Address: Ardersier Port Approach, Inverness, IV2 7QX
Email: enquiries@haventus.com
Website: www.haventus.com

  • Green Freeport
  • 1,400,000m2 Port Facility
  • 650m+ Deep Water Quayside
  • Naturally Sheltered Harbour
  • Statutory Harbour Authority

Value Proposition for Offshore Wind

  • Manufacturing

    Manufacturing

  • Assembly

    Assembly

  • Fabrication

    Fabrication

  • Marshalling

    Marshalling

  • Integration

    Integration

  • O&M

    O&M

Haventus Post 2

Existing Quayside & Water Depths

  • Quay Length at <8m CD Water Depth: 0
  • Quay Length at 8m-10m CD Water Depth: 0
  • Quay Length at 10m-12m CD Water Depth: 0
  • Quay Length at 12m+ CD Water Depth: 659m
  • Total Quay Length: 659m
HAVENTUS 0395

Existing Site Infrastructure

  • Max Load Bearing - Quayside: 25 t/m² UDL
  • Max Load Bearing - Storage Area: 25 t/m² UDL
  • Available Space at Quayside: 1,400,000m2
HAVENTUS 1625

Future Infrastructure Plans

  • Quayside Length: 1,500m
  • Water Depth - Minimum: 3.0m
  • Water Depth - Maximum: 12.4m
  • Load Bearing - Quayside: 25 t/m²
  • Load Bearing - Storage Area: 25 t/m²
  • Yard Space at Quayside: 2,200,000m2
  • Dry Storage
  • Year of Implementation: 2025
  • Year Available: 2028
Haventus Post 3 002

Existing Infrastructure for XL Components

  • Heavy Lift Quay Length: 659m
  • Heavy Lift Quay Area: 49,779m²
  • Heavy Lift Load Bearing - Quayside: 25 t/m² UDL
  • Large Component Laydown Area: 150 Hectares
  • Laydown Area Load Bearing Capacity: 25 t/m² UDL

Future Infrastructure for XL Components

  • Heavy Lift Quay Length: 1,500m
  • Heavy Lift Quay Area: 240,419m²
  • Heavy Lift Load Bearing - Quayside: 25 t/m² UDL
  • Large Component Laydown Area: 150 Hectares
  • Laydown Area Load Bearing Capacity: 25 t/m² UDL