Hunterston PARC offers a strategic location for offshore wind development, with deep-water access, large-scale laydown areas, and grid connectivity. Its infrastructure supports turbine assembly, maintenance, and logistics, making it ideal for accelerating Scotland’s renewable energy transition and supporting the growth of the offshore wind supply chain.
Address: Hunterston Terminal, Fairlie KA29 0AZ
Email: marketing@peelports.com
Website: www.hunterstonparc.com
- 15 Hectares of yard space
- 30,000m2 Covered Storage Area
- 840m Quay Length at 12m+ CD Water Depth
Existing Quayside & Water Depths
- Quay Length at <8m CD Water Depth: 70m
- Quay Length at 8m-10m CD Water Depth: 0m
- Quay Length at 10m-12m CD Water Depth: 0m
- Quay Length at 12m+ CD Water Depth: 840m
- Total Quay Length: 910m
Existing Site Infrastructure
- Max Load Bearing - Quayside: 5 t/m² UDL
- Max Load Bearing - Storage Area: 3 t/m² UDL
- Yard Space at Quayside: 15 Hectares
- Covered Storage: 30,000 m²
- Wet Storage: 1
Future Infrastructure Plans
- Quayside Length: 1,160
- Water Depth - Minimum: 12.0m
- Water Depth - Maximum: 36.0m
- Load Bearing - Quayside: 20 t/m²
- Load Bearing - Storage Area: 10 t/m²
- Yard Space at Quayside: 38 Hectares
- Wet Storage: 2
- Year of Implementation: 2026
- Year Available: 2028
Existing Infrastructure for XL Components
- Heavy Lift Quay Length: 840m
- Heavy Lift Quay Area: 15,300m²
- Heavy Lift Load Bearing - Quayside: 5 t/m² UDL
- Large Component Laydown Area: 20 Hectares
- Laydown Area Load Bearing Capacity: 10 t/m² UDL
Future Infrastructure for XL Components
- Heavy Lift Quay Length: 250m
- Heavy Lift Quay Area: 7,200m²
- Heavy Lift Load Bearing - Quayside: 20 t/m² UDL
- Large Component Laydown Area: 34 Hectares
- Laydown Area Load Bearing Capacity: 10 t/m² UDL