Over the last 10-years, the Port has handled over 300 wind turbines and with substantial areas of laydown space, and further areas available, accessed from six berths it can handle logistics and storage for multiple projects.
As a tax site, existing development plans for shipbuilding, mixed use offices/workshops, 8ha of laydown and a new 200m quay can be accelerated.
Address: Harbour Office, Longman Drive, Inverness IV1 1SU
Email: sinclair@portofinverness.co.uk
Website: www.portofinverness.co.uk
- Green Freeport
- 735m Combined Quayside
- Experience handling over 300 wind turbines
Existing Quayside & Infrastructure
- Quay Length at <8m CD Water Depth: 735m
- Total Quay Length: 735m
- Max Load Bearing - Quayside: 50 t/m² UDL
- Max Load Bearing - Storage Area: 50 t/m² UDL
- Yard Space at Quayside: 5
- Covered Storage: 4,606 m²
- Wet Storage: 0
Future Infrastructure Plans
- Quayside Length: 735m
- Water Depth - Minimum: 6.0m
- Water Depth - Maximum: 6.0m
- Load Bearing - Quayside: 50 t/m²
- Load Bearing - Storage Area: 50 t/m²
- Yard Space at Quayside: 29 Hectares
- Wet Storage: 0
- Year of Implementation: 2025
- Year Available: 2027
Existing Infrastructure for XL Components
- Heavy Lift Quay Length: 150m
- Heavy Lift Quay Area: 3,000m²
- Heavy Lift Load Bearing - Quayside: 8 t/m² UDL
- Large Component Laydown Area: 8 Hectares
- Laydown Area Load Bearing Capacity: 10 t/m² UDL
Future Infrastructure for XL Components
- Heavy Lift Quay Length: 150m
- Heavy Lift Quay Area: 3,000m²
- Heavy Lift Load Bearing - Quayside: 8 t/m² UDL
- Large Component Laydown Area: 8 Hectares
- Laydown Area Load Bearing Capacity: 10 t/m² UDL