Haventus is the owner of Ardersier Port, an energy transition facility offering deployment solutions across the entire value chain. With access via sea and road to more than 450 acres, an initial >650 metres of quay and a naturally sheltered harbour, Ardersier Port offers a prime location for optimised and efficient operations.
Address: Ardersier Port Approach, Inverness, IV2 7QX
Email: enquiries@haventus.com
Website: www.haventus.com
- Green Freeport
- 150 Hectares Yard Space
- 650m+ Deep Water Quayside
- Naturally Sheltered Harbour
Existing Quayside & Water Depths
- Quay Length at <8m CD Water Depth: 0
- Quay Length at 8m-10m CD Water Depth: 0
- Quay Length at 10m-12m CD Water Depth: 0
- Quay Length at 12m+ CD Water Depth: 659m
- Total Quay Length: 659m
Existing Site Infrastructure
- Max Load Bearing - Quayside: 25 t/m² UDL
- Max Load Bearing - Storage Area: 10 t/m² UDL
- Yard Space at Quayside: 150 Hectares
- Covered Storage: 0
- Wet Storage: 0
Future Infrastructure Plans
- Quayside Length: 1,600m
- Water Depth - Minimum: 3.0m
- Water Depth - Maximum: 12.4m
- Load Bearing - Quayside: 25 t/m²
- Load Bearing - Storage Area: 10 t/m²
- Yard Space at Quayside: 150 Hectares
- Wet Storage: TBD
- Year of Implementation: 2025
- Year Available: 2028
Existing Infrastructure for XL Components
- Heavy Lift Quay Length: 659m
- Heavy Lift Quay Area: 49,779m²
- Heavy Lift Load Bearing - Quayside: 25 t/m² UDL
- Large Component Laydown Area: 150 Hectares
- Laydown Area Load Bearing Capacity: 10 t/m² UDL
Future Infrastructure for XL Components
- Heavy Lift Quay Length: 1,600m
- Heavy Lift Quay Area: 240,419m²
- Heavy Lift Load Bearing - Quayside: 25 t/m² UDL
- Large Component Laydown Area: 150 Hectares
- Laydown Area Load Bearing Capacity: 10 t/m² UDL